Every other raised bed material on this site is a compromise with rot or time: wood softens, sleepers age, even cinder block weathers. Brick is the build you make once. A brick bed also fails differently from the others, not by rotting but by heaving, cracking, and leaning when its footing and bond are skimped, which is why the brick literature spends its care on the courses below ground level and the pattern above it. This page runs the material decisions in order: which bricks, what footing, which bond, whether to mortar, and how many bricks the bed actually takes, with the arithmetic shown, because the published counts for the same bed disagree by a factor of three and a builder deserves to know why. The site's other material builds, cinder block and the railway sleeper bed, make the comparison set; brick wins on permanence and finish, and loses on cost, weight, and the unforgiving nature of a wall built in the wrong place.
Home / Garden Projects and Outdoor Living
How to Build a Raised Bed From Bricks: Dry-Stack or Mortared, With the Brick Math

Photo: Thịnh Nguyễn Văn / Pexels
Brick Raised Bed Build Checklist
Check off each step as you finish it. Your progress stays on this page.
0 of 8 complete
0% done
Choosing Bricks: Solid, Clay, and Sound
Buy or salvage solid clay bricks, and inspect the adjective as carefully as the noun. Solid means no holes: perforated bricks, the kind with cores through them that modern house brick often has, trap water in those cores when laid as a garden wall, and freeze-thaw cycles crack them from inside within a few winters. Solid clay pavers and old solid house bricks are the right stock. Concrete bricks and pavers also work and are often cheaper and more uniform, at some cost in looks. Reclaimed brick is the budget and character choice, with three sourcing checks. Reject painted brick for food-growing soil unless the bed is lined, because old paint can carry lead. Reject fire-damaged or crumbling brick, which has lost the hardness the wall depends on; a sound brick rings when tapped, a dead one thuds. And expect reclaimed stock to vary in size, which argues for the dry-stack method below, where variation is absorbed course by course, over mortar joints that advertise every inconsistency. Whatever the source, order or gather about 10 percent over the count, because breakage, cuts at corners, and the one pallet's worth of ugly bricks are certainties, not risks.
The Footing and the Bond
A brick wall stands on its trench. Dig a level trench around the bed's perimeter, about 6 inches wide and deep enough for 2 to 3 inches of gravel plus the first course sunk partly below grade. Fill with gravel or crushed stone, tamp it firm and level, and check the level along the whole run, because every error in the footing prints through every course above it and brick, unlike wood, cannot be shimmed into forgiveness later. Lay the first course on the gravel, level in both directions, brick by brick. Above the footing, lay in running bond: each course offset by half a brick from the one below, so vertical joints never align, and at the corners overlap the bricks alternately, each course tying into the other wall, which is what makes two walls into one box instead of four stacks leaning against each other. The course-to-height arithmetic governs the design: one course of standard brick with a mortar joint stands about 4 inches high in round planning numbers when laid as a stretcher wall with the brick's bed face down in its wide orientation, two courses about 8 inches, three courses about 12, which is the standard raised bed depth the soil tables elsewhere assume. Dry-stacked walls laid flat in the wide orientation stand a little lower per course; measure your actual brick and do your own multiplication before ordering.

Dry-Stack or Mortared: The Decision Table
Up to 3 or 4 courses, on the Kellogg Garden guidance, a brick bed can stand dry-stacked, unmortared, held by weight, bond, and the soil's outward pressure being modest at that height. Dry-stack is reversible, forgiving of reclaimed stock, and buildable in an afternoon with no curing. Above that height, or wherever the bed must be a retaining structure against a slope, the wall wants mortar or a double-width build, two bricks thick with the courses tied across. Mortar makes the bed permanent in the full sense, immovable without demolition, which is a commitment about the garden's layout for decades and should be made with the site's plan settled.
| Factor | Dry-stack | Mortared |
|---|---|---|
| Practical height | Up to 3 to 4 courses (about 12 inches) | Any garden height |
| Skill and time | Low; an afternoon | Masonry skill; curing days |
| Reversibility | Full; restack or move anytime | Demolition only |
| Reclaimed brick fit | Excellent; absorbs variation | Poor to fair; joints show variation |
| Best for | Standard beds, renters of time | Permanent terraces, retaining edges |
Soil pressure deserves one sentence of respect: a 12-inch bed pushes gently, a 24-inch bed pushes like it means it, and the tall dry-stack walls that fail in photographs failed by bowing outward at the middle course. If you want height without mortar, build double-width and step the wall back slightly at each course; the pyramid does not bow.
The Brick Math: Why Counts Range from 80 to 300
Published brick counts for a 4 by 8 foot bed at 12 inches high range from about 80 bricks to 240 to 300, and the spread confuses every builder who meets it. The counts are not errors; they are different walls wearing the same bed dimensions. The low count describes a single-width wall of large bricks or pavers laid in the wide orientation, where each brick covers maximum wall face per course and three courses reach the height: the perimeter of a 4 by 8 bed is 24 feet, and at roughly 8 inches of wall face per brick, a course takes about 36 bricks, so three courses land near 100, and a leaner brick or a two-course design lands near 80. The high count describes a wall built from standard modular bricks laid as stretchers in the narrow orientation, where each brick shows only about 8 by 2.25 inches of face, so a course takes the same 36 bricks but the height needs five to six courses, and a double-width wall doubles it again into the 240 to 300 range. The formula that cuts through all of it: bricks per course equals the bed's perimeter in inches divided by your brick's laid length including a joint allowance, and total bricks equals that figure times courses times wall widths. Measure your actual brick, run your own arithmetic, add the 10 percent, and ignore every internet count, including the ones quoted here, that was computed for a different brick in a different wall.
Filling and Finishing
Fill a brick bed as the other builds are filled, with the soil mix matched to the planting, and observe one brick-specific rule: fill in stages and let the soil settle between waterings on a dry-stack build, because a bed filled dry and then soaked settles unevenly and can push a green wall before it has settled into its footing. Cap the wall if you like the finish: a course of bricks laid flat as a soldier or sailor cap, or stone or tile coping, gives the bed its finished edge, a sitting rim for the gardener, and a slug-unfriendly dry top. Mortared builds want a week of curing before filling. Then the bed enters the permanent furniture of the garden, asking nothing for decades beyond the soil top-ups every bed needs, which is the entire argument for brick, stated in maintenance.
Brick Beds on Slopes and Against Walls
Two sites ask more of a brick bed than the standard rectangle. On a slope, the bed becomes a low retaining structure whether it wants to or not: the downhill wall holds back the full soil depth plus the slope's contribution, and that wall should be mortared or double-width even at 3 courses, stepped into the hill so each section of bed is level even though the garden is not. Drainage behind and through the downhill wall matters, a gravel backfill and, in mortared work, weep gaps left in the lowest course's joints, because a brick wall that dams water will be pushed by it in the first wet winter. Against a house wall or fence, the brick bed borrows the fence-line rule from this site's fence bed guide: hold the bed off the building or fence with an air gap and a gravel strip rather than building against it, because brick against brick still traps moisture at the interface, and a damp course against a house wall is a problem with a mortgage attached. Both cases keep the standard sequence, footing first, running bond, honest brick math, and both repay the extra courses exactly the way the standard bed does, in decades of asking nothing.
Related guides
More from the same bed, bench, and border:
- How to Build a Raised Bed with Decking Boards: Thick Stock, Simple Math
- How to Build a Raised Bed on Concrete: The Slab Bed System
- How to Start Composting: Your First Pile, From Corner to Finished Compost
- How to Build a Stone Raised Bed: Dry-Stack Walls That Drain and Last
Frequently Asked Questions
How many bricks do I need for a 4 by 8 raised bed?
It depends on your brick and wall style, which is why published counts range from about 80 to nearly 300 for the same bed. Run the formula: perimeter in inches divided by your brick's laid length gives bricks per course; multiply by courses and by wall widths, then add 10 percent. A single-width wall of large pavers at 3 courses lands near 100; a double-width wall of modular brick at 5 to 6 courses lands near 300.
Can I dry-stack a brick raised bed or do I need mortar?
Up to 3 or 4 courses, about 12 inches, dry-stack is sound on the standard guidance, held by weight and running bond on a tamped gravel footing. Taller beds, or any bed retaining a slope, want mortar or a double-width wall. Dry-stack's advantages are speed, reversibility, and tolerance for varied reclaimed brick.
What kind of bricks should I use?
Solid clay bricks or solid pavers. Avoid perforated bricks, whose cores trap water that freezes and cracks them. For reclaimed stock, reject painted brick near food soil unless the bed is lined, and reject crumbling or fire-damaged brick; a sound brick rings when tapped.
How deep should the footing be?
A level trench with 2 to 3 inches of tamped gravel or crushed stone, with the first course set partly below grade. The footing's level is the wall's destiny: errors print through every course, and brick cannot be shimmed later the way wood can.
How high is each course of bricks?
Plan on about 4 inches per course for standard brick laid wide with a mortar joint, so 2 courses make about 8 inches and 3 make the standard 12-inch bed. Dry-stacked and narrow-orientation walls differ, so measure your actual brick and multiply before ordering.
Photo credits: Thịnh Nguyễn Văn (Pexels); Sunny Li (Pexels). Photos are served from this site; follow the credit to the library page for the original.